Pay new logo AEs mostly on the new ARR they close themselves. A pure hunter plan runs about 50-55% base and 45-50% variable, sets quota territory by territory, and starts accelerators at 100% of quota with no cap. Build the curve so a rep at 150% of quota earns about twice their target variable (The Carrot IS the Stick, Chapter 7).
Pay hunters on the wrong measure and they chase the wrong deals, and a cap tells them when to stop selling. This page is the hunter chapter of the Sales Comp Design Guide.
Who counts as a hunter, and who doesn’t?
A hunter wins customers who have never paid you anything. In a pure hunter role the job ends at signature, and onboarding, renewal, and expansion belong to someone else. If your AEs also keep the account through first renewal or into expansion, they are a hunter plus farmer hybrid, and they need a different plan.
The hybrid is getting more common. The 2025 ICONIQ data cited in Chapter 7 shows about half of companies now give the sales team primary ownership of upsell and cross-sell, 5 points higher than in 2023. Hybrid AEs earn 5-10% more OTE than pure hunters, which fits a job with two quotas instead of one (The Carrot IS the Stick, Chapter 7).
| Pure hunter | Hunter plus farmer hybrid | |
|---|---|---|
| What they own | New logos, up to contract signature | New logos, plus the account through first renewal or expansion |
| What the plan rewards | Speed and volume of new deals | New deal urgency, balanced with patience in existing accounts |
| Measures and quotas | One measure (new ARR or bookings), one quota | A second measure and a second quota for the existing book |
| OTE | Standard for the role | 5-10% premium (The Carrot IS the Stick, Chapter 7) |
| What goes wrong with the other plan | Given a hybrid plan, they move slower, guarding accounts that belong to someone else | Given a pure hunter plan, their existing accounts get ignored |
Decide which role you have before you write a single rate. A pure hunter plan on a hybrid role is the most common structural mistake in AE comp (The Carrot IS the Stick, Chapter 7).
What goes into a hunter comp plan?
A hunter plan has four parts: the primary measure, the pay mix, the quota, and the accelerators. Miss on any one of them and you can expect a comp dispute within the first 90 days (The Carrot IS the Stick, Chapter 7).
| Component | What to do |
|---|---|
| Primary measure | New ARR or new bookings, credited to the individual rep. Pay on signature or first invoice. This measure should drive 70-80% of variable pay. |
| Pay mix | 50-55% base and 45-50% variable for a pure hunter. Early-stage companies often go to 55-60% variable to match the higher risk. |
| Quota | Set for each territory based on the opportunity in it. Never divide the revenue plan by headcount. |
| Accelerators | Start at 100% of quota and step up at 125% and 150%. No ceiling. |
Source: The Carrot IS the Stick, Chapter 7.
The quota row is where most plans break. A peanut butter quota, spread evenly from the team number, hands one rep an easy year and another an impossible one. The quota-setting guide covers how to size each territory first.
The ratchet effect teaches your best hunters to sandbag. A hunter with a $1.5M quota who closes $2.1M and sees next year’s number jump will start pushing big closes into Q1. A territory that supports $2M a year in new ARR should carry a $2M quota no matter who works it (The Carrot IS the Stick, Chapter 7).
How do you build the hunter payout curve?
Use a threshold, a base rate up to quota, and three accelerator tiers above it. Set the base rate so a rep at exactly 100% of quota earns their target variable. Treat the rates below as a starting point and test them against your own numbers.
| Attainment | Example rate | Purpose of the tier |
|---|---|---|
| 0-50% | 0%, or a reduced rate | Threshold. Little or no variable until the rep is in the game. |
| 50-100% | Base rate, for example 8-10% of new ARR | Standard commission while the rep works toward quota. |
| 100-125% | Accelerator 1, for example 12-13% | Kicks in the moment the rep hits quota. |
| 125-150% | Accelerator 2, for example 15-16% | Rewards exceptional performance. |
| 150% and up | Accelerator 3, for example 18-20% | No ceiling. If quotas are right, your stars live here. |
Source: example rates from The Carrot IS the Stick, Chapter 7.
If the base rate pays on every dollar up to quota, these examples put a rep at 150% near 1.7 to 1.9 times target variable, short of 2x. Reaching 2x takes the first two accelerator rates that add up to about four times the base rate. Also decide whether crossing the 50% threshold pays back to the first dollar. If it doesn’t, the base rate has to be higher to reach target variable at 100%.
If the base rate doesn’t pay target variable at exactly 100% of quota, fix the rate and leave the quota alone.
Chapter 7 cites 2025 ICONIQ data showing the market expects top performers to earn about 2x their target variable. With a $100,000 target variable, a rep at 150% of quota should land near $200,000 in variable pay. ICONIQ’s 2023 survey of 236 B2B SaaS go-to-market executives found the same 2x ratio at top-performing companies (The Carrot IS the Stick, Chapter 6).
Should commission start at the first dollar?
It can. The 50% threshold is a choice, not a rule. The case for a threshold is that a rep below half of quota has either a territory problem, which is management’s job, or a performance problem, which commission shouldn’t subsidize (The Carrot IS the Stick, Chapter 7).
Should a hunter plan cap commissions?
No. A cap tells your best hunters to stop selling, and the cost never shows up on a dashboard. Misra and Nair (2011) studied a contact lens manufacturer that capped commissions. When the company removed the cap and the quarterly quota structure, revenue rose about 9% (The Carrot IS the Stick, Chapter 7).
Inside a capped quarter, reps hold back early, speed up near quota, and brake near the cap. Finishing far above the cap only raises next quarter’s quota. Only 14% of companies in ICONIQ’s 2023 survey formally cap commissions (The Carrot IS the Stick, Chapter 6). More in our research note on commission caps and the Misra and Nair study.
Should you pay a bonus for each new logo?
Pay one when deal sizes vary widely, and keep it smaller than the commission on the deal. A new logo carries strategic value that an upsell of the same dollar amount doesn’t, and a flat per-logo bonus recognizes that without touching the commission rates.
It helps when a hunter sells a mix of $500,000 enterprise contracts and $15,000 small-business deals. Under a flat rate, the small ones don’t seem worth the time, and the bonus changes that math. It hurts when it gets too big. At $5,000 for every logo regardless of size, reps start counting logos instead of building ARR (The Carrot IS the Stick, Chapter 7).
What does fixing a hunter plan look like?
Usually it means splitting new business from renewals so the plan stops paying the same rate for both. Make new ARR the main measure with the richer rate and the accelerators, and give renewals their own lower-weighted measure.
In 2023, Erik W. Charles worked with an EdTech company selling into K-12 schools (The Carrot IS the Stick, Chapter 7). Nobody on its regional sales team had hit quota the year before, and leadership blamed the market. The plan was the problem. Reps carried one quota for new logos and renewals, paid at a single rate. So they worked the big, stable renewal base and treated new logos as the risky part of the job.
In the new plan, renewals paid on the renewal date, every new school district earned a bonus, and accelerators applied only to the new ARR target.
Reps started prospecting neighboring districts, and within two quarters they were signing noticeably more new ones. The reps who were really renewal managers left or changed roles.
How do you test a hunter plan before it goes live?
Run it through five questions. A plan that fails any one of them isn’t ready (The Carrot IS the Stick, Chapter 7, except where noted).
- Can a rep figure out their pay on any deal within two minutes? If not, it’s too complex to steer behavior as deals happen.
- What does commission cost in total if 60-70% of reps hit quota? If you can’t afford it at normal attainment, the rate is too high or the quota too low.
- What happens to a rep who closes one huge deal and nothing else all year? If the plan rewards lottery tickets, fix the quota or the structure.
- Does any rep have a reason to push a deal into the next period? Larkin (2014) found this kind of deal timing, paid for with discounts, cost 6-8% of revenue (The Carrot IS the Stick, Chapter 2). See our note on deal timing and the Larkin study.
- Does a rep at 150% of quota earn about twice their target variable? If not, the tiers are too flat or the quota is too easy.
How should you set quotas for new hunters?
Set first-year quotas so about 60-65% of new hires hit them, not 80% or more. Research on more than 27,000 new hires, cited in Chapter 7, found reps who reached 90-99% of quota in year one ramped to full productivity three times faster than reps who reached 100% or more. A near miss keeps them hungry.
Newer reps also avoid big deals as a matter of risk, and coaching alone won’t change that (The Carrot IS the Stick, Chapter 7). Pair them with experienced co-sellers on large opportunities, or add a deal-size bonus.
Frequently asked questions
Sources
- Erik W. Charles, The Carrot IS the Stick: A Practical Guide to Sales Incentive Compensation (Braided Line Advisory, LLC, 2026), Chapter 7, “Paying the Hunter”: plan structure, payout curve, new logo bonuses, EdTech example, sign-off questions, research on deal size, the ratchet effect, and new hire attainment.
- The Carrot IS the Stick, Chapter 6, “Pay Mix and On-Target Earnings”: ICONIQ Growth 2023 sales compensation survey (236 B2B SaaS go-to-market executives), leverage ratio and commission cap prevalence.
- The Carrot IS the Stick, Chapter 2: Larkin (2014) on deal timing.
- ICONIQ Growth, 2025 sales compensation data, as cited in The Carrot IS the Stick, Chapter 7.
- Misra, Sanjog, and Harikesh S. Nair (2011). “A Structural Model of Sales-Force Compensation Dynamics: Estimation and Field Implementation.” Quantitative Marketing and Economics 9 (3): 211-257.
- Larkin, Ian (2014). “The Cost of High-Powered Incentives: Employee Gaming in Enterprise Software Sales.” Journal of Labor Economics 32 (2): 199-227.
- Research on more than 27,000 new hires and first-year attainment, as cited in The Carrot IS the Stick, Chapter 7.
Model this plan before you roll it out
Every check on this page is math. Run the 100% check, the 150% check, and the cost check on your own reps before the plan reaches your team. If you want help running those numbers, talk to us. We don’t know yet if we’re the right fit for you, so let’s find out.
Back to the Sales Comp Design Guide